HMCS Sackville on Syncrolift in HMC Dockyard for 3 month Refit

HMCS Sackville high and dry on the Syncrolift on 11 Feb. 2018. She will be moved inside a shelter for an estimated 3-month refit.

Photo by Doug Struthers