HMCS Sackville high and dry on the Syncrolift on 11 Feb. 2018. She will be moved inside a shelter for an estimated 3-month refit.
Photo by Doug Struthers
HMCS Sackville high and dry on the Syncrolift on 11 Feb. 2018. She will be moved inside a shelter for an estimated 3-month refit.
Photo by Doug Struthers